Main station|Member Center|Save the desktop|Mobile browsing
Ordinary Member

Ningjin Green Source New Building Materials Technology Co

Various equipments for thermal insulation boards, partition boards and blocks

sell
  • There is no classification
contact
  • Contact:王经理
  • Phone:0534-5211930
search
 
link
  • There is no link yet
home > sell > Cast-in-place demolition-free exterior wall composite insulation board equipment production line
Cast-in-place demolition-free exterior wall composite insulation board equipment production line
products: Views:9Cast-in-place demolition-free exterior wall composite insulation board equipment production line 
brand: 绿源
外机尺寸: 40*5*5
price: 380000.00元/套
MOQ: 1 套
Total supply: 10 套
Delivery date: Shipped within 30 days from the date of payment by the buyer
Valid until: Long-term validity
Last updated: 2015-06-26 16:01
 
Details
Fully automatic insulation board equipment/building demolition-free exterior formwork equipment Shandong Ningjin Luyuan Building Materials Equipment Co., Ltd. specializes in the production of fully automatic insulation board equipment, building demolition-free exterior formwork equipment, cement foam insulation board equipment, and fully automatic self-insulating block equipment , a high-tech building energy-saving enterprise with perlite insulation board equipment and lightweight partition board equipment. The products are reasonably priced and of high quality. New and old customers are welcome to call us for detailed discussions. Our aim is to rely on wisdom for small wins and morality for big wins. We are based on the attitude of integrity first, professional focus and first-class service.
The fully automatic insulation board equipment uses a cement-based double-sided composite insulation board as a permanent outer formwork. Concrete is poured on the inside and a protective layer of anti-crack mortar is applied on the outside. The double-sided composite insulation formwork is firmly connected to the concrete through connectors. An insulation structural system formed by connecting together. This system is a cast-in-place reinforced concrete composite insulation structure system and is suitable for cast-in-place concrete structural projects such as exterior walls, columns, and beams of industrial and civil building frame structures and shear wall structures.
It is composed of insulation board, insulation transition layer, inner and outer bonding reinforcement layers and reinforcement ribs. The product has the characteristics of light weight, good insulation effect, convenient construction, good fire protection performance, no safety hazards, and has the same lifespan as the building. and other excellent characteristics.
During the construction of the insulation board system, the composite insulation board is used as the permanent external formwork on the outside. The cast-in-place concrete wall and the permanent external formwork are poured into one body and connected through anchor bolts to make it safer and more reliable. After the pouring is completed A protective layer of mortar is applied on the outside to meet the energy-saving requirements of the building.
Fully automatic insulation board equipment products have the following characteristics
) The design and construction technology is simple and easy to promote and apply in large areas. The load-bearing structural form of the cast-in-situ concrete frame (frame-shear) structure remains unchanged, and the beams, columns and shear walls are still designed according to current standards and specifications. The design standards and calculation software are complete, and the construction technology is mature, making it easy to promote and apply in large areas.
) Meet the integration technical requirements and achieve the same life span of building insulation and structure. The permanent composite thermal insulation external formwork is poured together with cast-in-place concrete components such as beams, columns and shear walls of the frame (frame-shear) structure, and is firmly connected through connectors with claw nuts (the tensile bearing capacity reaches the synchronous design, The technical requirements of simultaneous construction and simultaneous acceptance have achieved the purpose of building insulation and structure having the same lifespan.
) It adopts a multi-layer structure design type, which has high strength and good insulation performance. The permanent composite thermal insulation external formwork is composed of extruded insulation boards, reinforcing ribs, internal and external bonding reinforcement layers and insulation transition layers. It has high mechanical strength and can be used directly as external formwork. It has good thermal insulation performance and meets the energy saving requirements of buildings. standard requirements.
) has good fire resistance. The two main facades on both sides of the insulation layer are covered by cement polymer mortar protective layers, which can effectively avoid fires during the construction process. After the construction project is completed, the cement mortar protective layer on the outside of the insulation layer reaches above, and the fire resistance is greatly improved. improve.
) Adopt engineering prefabrication to ensure product engineering quality. The permanent composite thermal insulation external formwork is all factory-prefabricated. During use, there is no opportunity for fraud, and the phenomenon of cutting corners is eliminated. During the concrete pouring process, the product quality of the permanent composite thermal insulation external formwork was inspected on-site. Verification effectively prevents counterfeit and shoddy products from being used in construction projects.
) Creatively set up the thermal insulation transition layer to avoid common quality problems such as hollowing and cracking of the plaster layer. In the structural design of the permanent composite thermal insulation outer formwork, an insulation transition layer is set up, which alleviates the strain of the insulation formwork due to environmental changes and avoids common quality problems such as hollowing and cracking of the plaster layer.
) The temperature and formwork are combined into one, so the project cost is low. The permanent composite thermal insulation external formwork can be directly used as the external formwork for cast-in-situ concrete structure projects. It combines insulation and formwork into one, reducing the construction process and formwork consumption. No other insulation treatment is required, which improves construction efficiency and reduces the overall cost of the project. cost.
An excellent set of fully automatic insulation board equipment determines the profitability of a company. When choosing this equipment, you cannot just look at the price. The stable performance of the equipment is the most important. In addition, you must choose an equipment manufacturer with good after-sales service. , can solve the problems encountered in time and provide function upgrades of the equipment.
Request for quotation
A total of0articles  Related Comments: